Connect with us

News

RTA Opens Two Main Bridges Along Al Khail Road

Published

on

RTA Opens Two Main Bridges Along Al Khail Road

RTA Opens Two Main Bridges Along Al Khail Road. Dubai Roads and Transport Authority (RTA) has recently made a significant advancement in its infrastructure development by opening two major bridges on Al Khail Road, enhancing connectivity in the direction of Jebel Ali. This article explores the details of this development, its impact, and the ongoing progress of the Al Khail Road Development Project.

The New Bridges

In a major boost to Dubai’s transportation network, the RTA has inaugurated two key bridges at Zaa’beel and Al Quoz 1 along Al Khail Road. These new structures are designed to alleviate traffic congestion and improve travel efficiency in the region. Spanning a total of 1,350 meters, the bridges are engineered to handle a combined capacity of approximately 8,000 vehicles per hour.

Details Of The Bridges

Zaa’beel Bridge

The first of the newly opened bridges is situated at Zaa’beel. This bridge connects Zaa’beel Palace Street and Oud Metha Street to Al Khail Road towards Jebel Ali. With a length of 700 meters, it features three lanes and is capable of accommodating up to 4,800 vehicles per hour. This critical link is expected to streamline traffic flow and reduce bottlenecks in the area.

Al Quoz 1 Bridge

The second bridge is located at Al Quoz 1, providing a vital connection from Al Meydan Street to Al Khail Road towards Jebel Ali. Extending 650 meters, this two-lane bridge can handle 3,200 vehicles per hour. Its strategic placement aims to enhance traffic management and improve overall travel efficiency.

Progress Of The Al Khail Road Development Project

The Al Khail Road Development Project is a comprehensive initiative with a current completion status of 80 percent. The project involves the construction of 3,300 meters of new bridges and the widening of lanes over 6,820 meters. These improvements are being made across seven key sites on Al Khail Road, including Al Jaddaf, Business Bay, Zaa’beel, Meydan, Al Quoz 1, Ghadir Al Tair, and Jumeirah Village Circle.

Objectives And Benefits

The primary goals of the Al Khail Road Development Project are to:

  • Reduce Travel Time: The project aims to cut travel time by 30 percent.
  • Increase Capacity: The capacity of existing intersections and bridges will be expanded to accommodate an additional 19,600 vehicles per hour.
  • Enhance Traffic Efficiency: Improvements will address traffic overlaps at flyovers and ensure a smooth and continuous flow of traffic.

Statement From RTA Director General

Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of RTA, highlighted the strategic importance of the Al Khail Road Development Project. “This project is crucial for developing parallel and supporting road corridors to Sheikh Zayed Road, Sheikh Mohammed bin Zayed Road, and Emirates Road. Al Khail Road serves as a major arterial route extending from Business Bay Crossing to its intersection with Sheikh Mohammed bin Zayed Road, featuring up to six lanes in some sections,” Al Tayer explained.

Conclusion

The opening of the two main bridges along Al Khail Road marks a significant milestone in Dubai’s ongoing efforts to enhance its road infrastructure. With the completion of these bridges and the progress of the Al Khail Road Development Project, residents and commuters can expect improved traffic flow, reduced travel times, and increased road capacity. The RTA continues to invest in infrastructure projects that support the city’s growth and enhance the quality of life for its residents.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Trending