Connect with us

News

RTA Expands Bridges Across Sheikh Zayed Road With AED 165 Million

Published

on

RTA Expands Bridges Across Sheikh Zayed Road With AED 165 Million

RTA Expands Bridges Across Sheikh Zayed Road With AED 165 Million. Dubai is renowned for its rapid development and innovation, and its latest project is a testament to this dynamic spirit. The Roads and Transport Authority (RTA) has unveiled an ambitious AED 165 million plan to expand and improve the infrastructure along Sheikh Zayed Road, one of the city’s major thoroughfares. This article will guide you through the details of this exciting development and its anticipated benefits.

Expansion

Dubai’s commitment to improving urban mobility continues with the RTA’s latest initiative. This project focuses on alleviating traffic congestion on Sheikh Zayed Road, a crucial route in the city. The expansion is set to enhance connectivity, reduce travel times, and contribute to a smoother traffic flow around the Mall of the Emirates area.

Key Features Of The Project

A. Construction Of A New Bridge

One of the main highlights of this project is the construction of a 300-meter bridge on Sheikh Zayed Road. This bridge will provide direct access to the Mall of the Emirates parking lot for drivers traveling from Abu Dhabi and Jebel Ali. The introduction of this new route is expected to:

  • Reduce Travel Time: The journey from Abu Dhabi and Jebel Ali to the mall will decrease from 10 minutes to just one minute.
  • Speed Up Travel from Umm Suqeim: Travel time from Umm Suqeim to the mall will be cut from 15 minutes to eight minutes.

B. Road Resurfacing And Improvements

The project includes significant upgrades to the existing road infrastructure, such as:

Resurfacing of Road Sections: Approximately 2.5 km of road around the mall will be resurfaced to improve driving conditions.
Enhanced Bus Station: The bus station at the Mall of the Emirates Metro Station will be upgraded to better serve commuters.
Improved Pedestrian and Cycle Lanes: New and enhanced lanes will be added for pedestrians and cyclists to ensure safer and more accessible travel.
Upgraded Rainwater Drainage System: The rainwater drainage system will be improved to handle rainfall more effectively.

C. Modifications And New Developments

Additional changes to support traffic flow and accessibility include:

  • Three Signalized Intersections: Development of three new intersections with traffic signals.
  • Conversion of Street Direction: The street next to the Kempinski Hotel will be converted from one-way to two-way.
  • Upgraded Paving, Lighting, and Traffic Signals: The road surface, lighting, and traffic signals will be modernized.

Expected Benefits

The expansion project is expected to:

  • Enhance Traffic Flow: By easing congestion and improving road access, the project will contribute to smoother traffic flow around the Mall of the Emirates.
    Reduce Travel Time: With the new bridge and road improvements, travel times in the area will be significantly reduced.
    Improve Accessibility: Enhanced pedestrian and cyclist infrastructure will make the area more accessible to everyone.

Looking Ahead

This development is part of Dubai’s broader vision to continuously enhance its infrastructure and transportation networks. For those considering relocating to this area or seeking information on new road expansions, the latest RTA plans represent a significant step towards improved urban mobility.

Conclusion

The RTA’s AED 165 million expansion project on Sheikh Zayed Road is set to bring considerable improvements to Dubai’s transportation infrastructure. With its focus on reducing travel times, enhancing road conditions, and improving accessibility, the project promises to make traveling around the Mall of the Emirates and the surrounding areas more efficient and enjoyable.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Trending